← All modulesQHSE03 / 03

Management of Change

Structured MoC questionnaires and approval workflow so changes are assessed, tracked, and closed out.

  • Staged gates
  • Risk review
  • Approval record
What it solves

Changes that skip review are the ones that turn into findings.

A permanent change to equipment, procedure or manning needs assessing, approving and recording. When that process lives in email, the record of why a change was accepted disappears with the thread.

  • A change is made and the risk assessment is written afterwards, if ever.
  • Nobody can say who approved a modification made two years ago.
  • The same change is proposed twice because the first rejection was not recorded.
  • Class asks for the change history and it has to be reconstructed.

The risk assessment completes and gate two closes, releasing the change for technical approval. Each gate keeps its reviewer and its reasoning, permanently.

How it works

From the event to the record

  1. 01

    Propose the change

    Describe what changes and why, with the equipment or procedure it affects attached.

  2. 02

    Assess the risk

    The change links to an assessment from the same risk library permits use, not a one-off document.

  3. 03

    Approve at each gate

    Each stage has its own authority and its own record. A change cannot pass a gate it has not cleared.

  4. 04

    Verify and close

    Implementation is confirmed on board, and the whole chain stays available for class and audit.

Capabilities

What the module includes

Structured questionnaire
Guided sections capture scope, risk, and impact
Approval workflow
The right people sign off before work starts
Action tracking
Implementation actions assigned and followed to closure
Import fidelity
Existing MoC registers migrate with their history
Cross-links
Connect changes to risk assessments and audits
Fleet visibility
Open changes visible at company level
Works with

One record, shared across the platform

Ready when you are

Ready to run your fleet on one platform?

One record for the office, the ships and your agents. Live in days.

Management of Change (MoC) Software | SeaQuest One