Management of Change
Structured MoC questionnaires and approval workflow so changes are assessed, tracked, and closed out.
- Staged gates
- Risk review
- Approval record
Changes that skip review are the ones that turn into findings.
A permanent change to equipment, procedure or manning needs assessing, approving and recording. When that process lives in email, the record of why a change was accepted disappears with the thread.
- A change is made and the risk assessment is written afterwards, if ever.
- Nobody can say who approved a modification made two years ago.
- The same change is proposed twice because the first rejection was not recorded.
- Class asks for the change history and it has to be reconstructed.
The risk assessment completes and gate two closes, releasing the change for technical approval. Each gate keeps its reviewer and its reasoning, permanently.
From the event to the record
- 01
Propose the change
Describe what changes and why, with the equipment or procedure it affects attached.
- 02
Assess the risk
The change links to an assessment from the same risk library permits use, not a one-off document.
- 03
Approve at each gate
Each stage has its own authority and its own record. A change cannot pass a gate it has not cleared.
- 04
Verify and close
Implementation is confirmed on board, and the whole chain stays available for class and audit.
What the module includes
- Structured questionnaire
- Guided sections capture scope, risk, and impact
- Approval workflow
- The right people sign off before work starts
- Action tracking
- Implementation actions assigned and followed to closure
- Import fidelity
- Existing MoC registers migrate with their history
- Cross-links
- Connect changes to risk assessments and audits
- Fleet visibility
- Open changes visible at company level
One record, shared across the platform
- QHSESafety & Quality (QHSE)An MoC can be opened from an HSE event or an audit finding, and records it as its origin.
- QHSEPermit to WorkBoth draw on one risk-assessment library, so a hazard reads the same whether it is temporary work or a permanent change.
- Vessel ManagementIMS & Company DocumentsA change that alters a procedure lists the IMS document among the items it affects.
Ready to run your fleet on one platform?
One record for the office, the ships and your agents. Live in days.