Planned Maintenance
Planned maintenance on the component tree — what is due, what was done, and what comes next — on calendar intervals, running hours, or both.
- Component tree
- Running hours
- Postpone and defer
- Job lists
A due date that can be moved quietly is not a plan.
Maintenance kept in spreadsheets, or in an old system on one computer, drifts. Due dates slide without a reason, running hours are guessed, and when the surveyor asks what was done and when, the answer is a search through folders.
- A job's due date has moved, and nobody can say why or who moved it.
- Running hours are entered in bulk at the end of the month, so hour-based jobs come due by surprise.
- Preparing for a docking means building the work list from scratch.
- The record of what was done can be edited after the fact.
A due job is postponed. The new date takes over on the due list, the original due date stays on the record beside it, and the move needs a reason.
From the event to the record
- 01
Build on the component tree
Equipment and its components, each with the jobs that keep it running — on a calendar interval, on running hours, or both.
- 02
Keep the hours current
Add readings or replace a counter. The daily average plans the hour-based due dates, and the forecast shows what is coming.
- 03
Report and sign out
Signing out completes the job and generates the next one from that date and counter. A sign-out can require an approved work permit or risk assessment.
- 04
Postpone or defer, on the record
A postponement keeps the original due date and needs a reason. Past the class window, a deferral request goes ashore to be approved or rejected.
What the module includes
- Calendar or running hours
- A job runs on an interval, on running hours, or on both
- Running-hour counters
- Add readings or replace a counter; the daily average plans hour-based due dates
- Postpone with a reason
- The original due date stays on the record, and the class window is checked
- Deferrals decided ashore
- The ship requests a deferral; the shore approves or rejects it
- History that stays true
- Completed work cannot be edited; a mistake is fixed with a correction record
- Job lists
- Work packs for a docking, a port stay or a survey, linked to the port call
One record, shared across the platform
- ProcurementWarehouse & InventoryParts used on a sign-out come out of warehouse stock in the same step.
- ProcurementPurchasingFrom the due list, a job or its planned parts go onto the vessel's requisition draft.
- QHSEPermit to WorkA sign-out can require an approved work permit before the job is completed.